Thanks Volker.

I guess my point is that for a track with high banking and chassis 3, there are no similar setups made by yourself that I can use as a base, so I will be wandering around in the dark on those.

It is a shame you have never downloaded them, as IRP, Milwaukee, Nashville, and Thompson are very nice tracks, and I probably don't do them justice as a setup maker.

Whilst I am going to try to update setups for the higher banked PWF tracks despite them being on chassis 3, I will redo Evergreen PWF setup first (8 deg banking, 0.65miles), as it should be similar to IRP.

One other question I have is regarding toe-out. I note that you have adjusted toe-out to +0.2 on the intermediate tracks, but not short tracks. Is this because it doesn't work, or because you haven't had time to change all the setups yet?

Thanks

Brad
   